SECTION 1

INSTALLATION

1---1

The ASCO 7000 Series Automatic Transfer Switch (ATS)
is factory wired and tested. Field installation requires
mounting, connecting service cables, and connecting
engine start and auxiliary control circuits (if required).

Supporting Foundation

The supporting foundation for the enclosure must be
level and straight. Refer to the applicable enclosure
outline drawing included with the switch for all
mounting details including door opening space.

If bottom cable entry is used, the foundation must be
prepared so that the conduit stubs are located correctly.
Refer to the enclosure outline drawing for specified
area and location. Provide cable bending space and ½
inch minimum clearance to live metal parts. When a
concrete floor is poured, use interlocking conduit spacer
caps or a wood or metal template to maintain proper
conduit alignment.

Mounting

Refer to the Outline and Mounting Diagram provided with
the ATS; it shows all mounting details and instructions.

Protect the switch from construction grit

and metal chips to prevent malfunction or

shortened life of the automatic switch switch.

Mount the ASCO ATS vertically to a rigid supporting
structure. Level all mounting points by using flat washers
behind the holes to avoid distortion of the switch.

The controller is mounted on the cabinet door. An
add-on DIN rail is provided for some optional accesso-
ries and is mounted below the controller on the door.

Line Connections

A Wiring Diagram is furnished with the ASCO 7000
Series ATS (separate from this manual). Refer to this
drawing. All wiring must be made in accordance with
the National Electrical Code and local codes.

De–energize the conductors before making any

line or auxiliary circuitry connections. Be sure

that Normal and Emergency line connections

are in proper phase rotation. Place engine gen-

erator starting control in the OFF position.

Make sure engine generator is not in operation.

Testing Power Conductors

Do not connect the power conductors to the transfer
switch until they are tested. Installing power cables in
conduit, cable troughs and ceiling-suspended hangers

often requires considerable force. The pulling of cables
can damage insulation and stretch or break the
conductor’s strands. For this reason, after the cables are
pulled into position, and before they are connected,
they should be tested to verify that they are not
defective or have been damaged during installation.

Connecting Power Conductors

After the power cables have been tested, connect them
to the appropriate terminal lugs on the transfer switch
as shown on the wiring diagram provided with the
switch. Make sure the lugs provided are suitable for use
with the cables being installed. Standard terminal lugs
are solderless screw type and will accept the wire sizes
listed on the drawings provided with the switch. Be
careful when stripping insulation from the cables; avoid
nicking or ringing the conductor. Remove surface
oxides from cables by cleaning with a wire brush. When
aluminum cable is used, apply joint compound to
conductors. Tighten cable lugs to the torque specified
on rating label.

Three cable spacers are included with 150, 200, & 230 A
transfer switches. When installing power cables, run the
cables through the cable spacers as shown in Figure 1-1.
Position the cable spacers within 1½ inches from the lugs.

The cable spacers must be located as shown

for 150, 200, and 230 ampere transfer switches.

cable spacer

cable spacers

1 ½ inch approximate

Figure 1-1. Cable spacer for 150, 200, and 230 amp.

transfer switches.

Controller Ground

A grounding wire must be connected to the controller’s
lower left mounting stud. Because the controller is
mounted on the enclosure door, a conductive strap
must be used between the enclosure and the door. This
connection provides proper grounding which does not
rely upon the door hinges.