Required tools, Setting the mode switches, Mode switch bank settings – Enterasys Networks 7S4280-19-SYS User Manual

Page 101: And optional installations

Advertising
background image

Enterasys NAC Controller Hardware Installation Guide B-1

B

Mode Switch Bank Settings

and Optional Installations

This appendix covers the following items:

Required Tools

Use the following tools to perform the procedures provided in this appendix:

Antistatic wrist strap

Phillips screwdriver

Setting the Mode Switches

The location on the main board of the mode switches for both the 2S4082‐25 and the 7S4280‐19 are 
the same. 

Figure B‐1

 shows the location of the mode switches and the switch settings for normal 

operation. These switches are set at the factory to the off position and rarely need to be changed.

Switch definitions and positions are as follows:

Switches 1 through 6 – For Enterasys Networks use only.

Switch 7 – Clear Persistent Data. Changing the position of this switch clears Persistent Data on 
the next power‐up of the module. All user‐entered parameters, such as the IP address or 

For information about...

Refer to page...

Required Tools

B-1

Setting the Mode Switches

B-1

Memory Locations and Replacement Procedures

B-2

Caution: An antistatic wrist strap is required to perform the following procedures to minimize ESD
damage to the devices involved.

Precaución: Para minimizar los efectos de las descargas de electricidad estática, deberá utilizar
una pulsera antiestática al realizar los siguiente procedimientos.

Caution: Read the appropriate sections to be fully aware of the consequences when changing
switch settings.

Only qualified personnel should change switch settings.

Precaución: Si desea modificar la configuración del interruptor, lea las secciones
correspondientes para saber cuál será el resultado de hacerlo.
Estas modificaciones a la configuración sólo debe realizarlas personal calificado.

Advertising
This manual is related to the following products: