Installing the rubber feet, Installing the chassis into a rack, Installing the chassis on the rack shelf – Enterasys Networks 7S4280-19-SYS User Manual

Page 37: Installing the rubber feet -3, Installing the chassis into a rack -3, Installing the chassis on the rack shelf -3, Installing the rubber, Feet

Advertising
background image

Installing the Chassis into a Rack

Enterasys NAC Controller Hardware Installation Guide 3-3

When installing the switch on a flat surface, the installation of the rubber feet is recommended to 
prevent the switch from sliding on a flat surface. Installing the rubber feet is optional if you are 
installing the switch in a rack. To install the rubber feet, proceed to 

“Installing the Rubber Feet

” 

 

instructions below. For instructions to rack mount the switch, proceed to “

Installing the Chassis 

into a Rack

” on page 3.

Installing the Rubber Feet

To install the rubber feet proceed as follows:

1.

Place the switch on its back on a sturdy flat surface to gain access to the bottom of the chassis.

2.

Remove the four rubber feet from their plastic bag in the shipping box.

3.

Locate the four marked locations on the bottom four corners of the chassis.

4.

Remove the protective strip from the back of one rubber foot and position it on a marked 
location and press firmly into place. Repeat this procedure to install the remaining three 
rubber feet in the other three locations.

5.

After installing the rubber feet, return the switch to its upright position.

6.

For a rackmount installation, proceed to

Installing the Chassis into a Rack

” on page 3

.

Installing the Chassis into a Rack

The Enterasys Matrix N1 Chassis can be mounted in a standard EIA‐310‐D compliant 
48.26‐centimeter (19‐inch) equipment rack. To mount the chassis into a rack you must allow at 
least 60 centimeters (24 inches) of clearance in front of the rack for chassis installation. Then decide 
whether to install the chassis on a shelf in the rack, or to attach the chassis directly to the rack.

Installing the Chassis on the Rack Shelf

To install the chassis on a rack shelf:

1.

Keeping the above Caution note in mind, locate the position on the rack where you will install 
the shelf.

2.

Refer to 

Installing the Rubber Feet

” on page 3.

3.

Align the four holes in the ears of the shelf with those in the rack, then fasten the shelf to the 
rack using four of the screws supplied with the rack.

4.

After installing the shelf, proceed to install the Enterasys Matrix N1 Chassis as described in 

Installing the Chassis Directly to the Rack

” on page 4.

Caution: Read

Chapter 2

before completing the following procedure to ensure that all installation

guidelines are met.
Precaución: Antes de llevar a cabo el siguiente procedimiento, lea

Chapter 2

para y asegúrese de

cumplir con todos los requisitos de instalación.

Note: In order to prevent a possible interference between the rack frame front and chassis rack
ears, the tapped rails may need to be adjusted such that they are recessed approximately 2 inches
behind the rack frame front. If the rack has a front door, this distance may need to be slightly more
depending on the door thickness.

Advertising
This manual is related to the following products: