Offline/reset switch for the 2s4082-25 -6, Offline/reset switch for the 7s4280-19 -6 – Enterasys Networks 7S4280-19-SYS User Manual

Page 66

Advertising
background image

Overview of the NAC Controller PEP Shutdown Procedure

5-6 Troubleshooting

Overview of the NAC Controller PEP Shutdown Procedure

The chassis must shut down in an orderly fashion to ensure that the other devices on the network 
are notified of the impending change. The devices can then make intelligent decisions and 
stabilize the network before the change is made; thereby increasing network availability.

You can shut down a NAC Controller PEP in an operating N1 Chassis using the 

OFFLINE/RESET 

switch

 shown in 

Figure 5‐2

. There are two procedures to shut down a chassis.

“Recommended Shutdown Procedure” 

(page 5‐7) 

“Last Resort Shutdown Procedure” 

(page 5‐7)

Figure 5-2 OFFLINE/RESET Switch for the 2S4082-25

Figure 5-2 OFFLINE/RESET Switch for the 7S4280-19

Caution: Do not remove a NAC Controller PEP from an operating chassis system before reading
the following information and instructions.

Precaución: Antes de retirar los módulos DFE del chasis en funcionamiento, lea las siguientes
instrucciones y la información suministrada.

1 OFFLINE/RESET switch

1 OFFLINE/RESET switch

Advertising
This manual is related to the following products: