Inside vertical installations - freestanding, Installation – Enviro Meridian User Manual

Page 21

Advertising
background image

Rain cap - ensure cap is at

least 2 feet (610mm) above

the roof at the lowest point

Storm collar

Roof flashing

Roof rafter

Fire stop with

Support Collar

Ceiling joist

Vertical vent pipe

Clean out tee with

Pipe adapter

ENVIRO Meridian

NOTE:

All vent sections must maintian 3"

(76 mm) clearances to combustibles.

Installation

I

NSIDE

V

ERTICAL

I

NSTALLATIONS

- F

REESTANDING

:

1. Choose a stove location that is ideal. See the section “I

NSTALLATION

- D

ECIDING

W

HERE

TO

L

OCATE

YOUR

P

ELLET

A

PPLIANCE

.”

2. Place the unit on the hearth pad (if installed on a carpeted surface) and space the unit in a manner

so when the pellet vent is installed vertically, it will be 3” (76 mm) away from a combustible wall.

3. Locate the center of the fresh air intake pipe on the unit. Match that center with the same point on

the wall and cut a hole about 2” (51 mm) in diameter.

Figure 27: Inside Vertical Installation.

4. Install the fresh air intake

pipe.

5. Install the tee with clean

out.

6.

I

nstall the pellet vent upward

from there. When you reach

the ceiling, make sure that

the vent goes through the

ceiling fire stop. Maintain

a 3” (76 mm) distance to

combustibles and keep

attic insulation away from

the vent pipe. Maintain an

effective vapor barrier.

7. Finally, extend the pellet

vent to go through the roof

flashing.

8. Ensure that the rain cap

is approximately 24” (610

mm) above the roof.