Installation – Harman Stove Company The Harman Accentra Pellet Insert User Manual

Page 14

Advertising
background image

15

Installation

Connecting the ground from the wing to the

stove body

The green wire with a female terminal is the stove

body ground.

• On the combustion air inlet box there is a male ter-
minal ground.

• If service is performed on this stove, this ground
connection must be the first one on and the last
one off.

Fig.31

Fig. 32

Fig. 33

15. Install the cast side panels by sliding them down
over the lasered hinge pin. Note: Check for rotational
swing, but finish with them in the open position. The
cast side panels may need adjustment after the stove
body is latched into place and the front door is closed.

Connecting the power cord

The white from the mounting frame connects to the
white of the insert body.The black from the mounting
frame connects to the brown of the insert body.

2 x 4

Lasered hinge pin pivoting point

Up and down clearance adjustment slots.

Cast side
panel hinge

Fig. 30

16. Place the stove body on the mounting shell gasketed
rails and insert the body into the opening far enough
that it can't tip out. Note: A service rail kit (Part #1-00-
08007), or a pair of 2 x 4's supported in front of the hearth
will make this job easier. See Fig. 31.

17. Complete the following electrical connections
(caution: Disconnect the power cord.) There are 5
connections that must be completed. See Fig. 33 & 34.

Evaluation notes were added to the output document. To get rid of these notes, please order your copy of ePrint IV now.

Advertising