C. Vertical Penetration Framing

Figure 8.3

Figure 8.4 Installing the Attic Shield

3 FASTENERS

PER SIDE

INSTALL ATTIC INSULATION SHIELDS

BEFORE OR AFTER INSTALLATION OF VENT SYSTEM

CEILING FIRESTOP

INSTALLED BELOW CEILING

CEILING FIRESTOP

INSTALLED ABOVE CEILING

ATTIC ABOVE

A

PIPE

DVP

SLP

A

10 in. (254 mm)

9 in. (229 mm)

A

A ceiling fi restop MUST be used between
fl oors and attics.

DVP pipe only - Frame an opening 10 in.

by 10 in. (254 mm by 254 mm) whenever
the vent penetrates a ceiling/fl oor (see
Figure 8.3).

SLP pipe only - Frame opening 9 in. x 9

in. (229 mm x 229 mm) whenever the vent
penetrates a ceiling/fl oor (see Figure 8.3).

• Frame the area with the same sized lumber

as used in ceiling/fl oor joist.

• The ceiling fi restop may be installed above or

below the ceiling joists when installed with a
attic insulation shield. It must be under joists
between fl oors that are not insulated. Refer
to Figure 8.4.

• Secure with three fasteners on each side.

WARNING! Risk of Fire! DO NOT pack insu-
lation around the vent. Insulation must be kept
back from the pipe to prevent overheating.