Heat & Glo Fireplace ST-36TRLP-IPI User Manual

Page 45

Advertising
background image

45

Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. G • 3/13

120º

Figure 10.8 Securing Vertical Pipe Sections

120º

Figure 10.9 Securing Horizontal Pipe Sections

E. Disassemble Vent Sections

• Rotate either section (see Figure 10.10) so the seams

on both pipe sections are aligned as shown in Figure
10.11.

• Pull carefully to separate the pieces of pipe.

Figure 10.11 Align and Disassemble Vent Sections

Figure 10.10 Rotate Seams for Disassembly

D. Secure the Vent Sections

• Vertical runs originating off the top of the appliance, with

no offsets, must be supported every 8 ft. (2.44 m) after
the maximum allowed 25 ft. (7.62 m) of unsupported rise.

• Vertical runs originating off the rear of the appliance, or

after any elbow, must be supported every 8 ft. (2.44 m).

• Horizontal runs must be supported every 5 feet (1.52

m).

• Vent supports or plumbers strap (spaced 120º apart)

may be used to support vent sections. See Figures 10.8
and 10.9.

• Wall shield fi restops may be used to provide horizontal

support to vent sections.

• SLP ceiling fi restops have tabs that may be used to

provide vertical support.

WARNING! Risk of Fire, Explosion or Asphyxiation!
Improper support may allow vent to sag and separate.
Use vent run supports and connect vent sections per in-
stallation instructions. DO NOT allow vent to sag below
connection point to appliance.

Advertising
This manual is related to the following products: