Vent clearances and framing, Warning, A. pipe clearances to combustibles – Heat & Glo Fireplace CERONA-36 User Manual

Page 19: B. wall penetration framing

Advertising
background image

Heat & Glo • Cerona-36, Cerona-42 • 2106-900 Rev. H • 11/08

19

A. Pipe Clearances to Combustibles

6

6

Vent Clearances and Framing

B. Wall Penetration Framing

Combustible Wall Penetration

Frame a hole in a combustible wall for an interior wall
shield fi restop, (Figure 6.3) whenever a wall is penetrated.
Use same size framing materials as those used in the wall
construction. The wall shield fi restop maintains minimum
clearances and prevents cold air infi ltration.

Non-Combustible Wall Penetration

If the hole being penetrated is surrounded by noncombus-
tible materials such as concrete, a hole with diameter one
inch greater than the pipe is acceptable.

Whenever a non-combustible wall is penetrated, the wall
shield fi restop is only required on one side and no heat
shield is necessary.

If your local inspector requires the wall shield fi restop on
both sides, then both wall shield fi restops must have a heat
shield attached to them.

Fire Risk.

Explosion Risk.

Maintain vent clearance to combustibles as
specifi ed.

• Do not pack air space with insulation or

other materials.

Failure to keep insulation or other materials
away from vent pipe may cause fi re.

Figure 6.1 Pipe Clearances

1 in. CLEARANCE

AROUND VERTICAL

SECTIONS

3 in. TOP

CLEARANCE

1 in. SIDE AND

BOTTOM CLEARANCE

Figure 6.3 Exterior Wall Hole

Figure 6.2 Horizontal venting clearances to combustible
materials

A

B

HEAT

SHIELD

HEAT

SHIELD

1 in. CLEARANCE
BOTTOM & SIDES

WALL

WALL

SHIELD

FIRESTOP

3 in. TOP

CLEARANCE

WARNING

Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm).
The heat shield is designed to be used on a wall 4 in. to 7-1/4 in.
(102 mm to 184 mm) thick.
If wall thickness is less than 4 in. (102
mm) the existing heat shields must be fi eld trimmed. If wall thickness is
greater than 7-1/4 in. (184 mm) a DVP-HSM-B will be required.

A

B

Cerona-36

in.

61-1/2

60-1/2

mm

1562

1537

Cerona-42

in.

72

71

mm

1829

1803

Shows center of 10 inch x 12 inch vent framing holes for
top and rear venting. The center of the hole is one (1) inch
(25.4 mm) above the center of the horizontal vent pipe.

Advertising