Assembly – Harman Coal Stoker VF3000 User Manual

Page 7

Advertising
background image

7

3-90-70741R13_05/13

Top

Left Side

Front

Boiler

Cleaning Rod

Spring Handle

Hopper -

Sold

separately

Door

Blank

Adapter

Plate

Base Jacket

Base

Ash Tub

Ash Door

Right Side

Baffle

Flue Pipe

Clean out slide

Flue Plate

Hopper

Support

The VF3000 is reversible as to which end the hopper and

flue pipe are located. Therefore, a decision must be made

as to which way will work best for your situation.
If you woud like to have the flue to the right and the hopper

to the left, make sure the gaskets are in place on both the

flue pipe and flue plate. Bolt the flue pipe on the right end

and the flue plate on the left end of the base. Next, the baffle

must be slid into place on the right end with the center of the

base. Note the baffle and flue pipe must always be at the

same end and opposite the hopper.
Next, place the base jacket around the base and clamp into

place with the four clamping bolts on the front of the base.

The hole in the jacket goes around the flue pipe.

Place 1/4” x 1” gasket around the flat edge on top of the

base. Now place the boiler on top of the base with the feeder

opening opposite the flue pipe. Place 1/4” x 1” gasket around

the door openings on the boiler. Bolt the door mount on the

front door opening with 5/16” x 1” flat head bolts. Bolt the

door blank on the rear opening with 5/16” x 1” hex head bolts.
Now the outer jacket can be installed. The front jacket with

the coil hole must be installed first. Next, the two sides which

hold the front in place and then the top which holds the sides

in place.

assembly

Advertising
This manual is related to the following products: