Gpi t – FOCUS Enhancements Bridge/Router MX-4DV User Manual

Page 125

Advertising
background image

A

DVANCED

O

PERATIONS

I

NSTRUCTIONS

FOR

B

UILDING

A

GPI T

RIGGER

121

I

NSTRUCTIONS

FOR

B

UILDING

A

GPI T

RIGGER

This section contains a diagram of the GPI Trigger Button you can build and all associated instruc-
tions.

Required Tools

and Parts

Soldering Iron and Solder
Wire Cutters
Electric Drill

Parts Required

A “normally open momentary push-button switch” (A).

One four-inch piece of 3/4-inch PVC pipe (C) and two end caps
(B and E).

3-conductor, 22-24 gauge stranded wire cable (D).

A stereo 3.5-mm mini-pin plug (F)

Instructions 1

Drill a 1/4-inch hole in the center of one PVC end cap (E) and a hole to match the push-button
switch in the other end cap (B).

2

Feed one end of the cable through the end cap with the 1/4-inch hole (E) and strip the end of
each wire.

3

Tie a single knot (D) about 8 inches from the end of the wire.

4

Slide the wire through the PVC pipe, the nut and washer, and the other end cap (B).

5

Solder the two wires at the knotted end to the two poles on the switch (A).

6

Slip the switch into the end cap and secure it using the nut and washer.

7

Solder the other ends of the cable to the plug (F).

8

Connect to the tip (G) and the base (H) of the plug. Don’t connect anything to the middle sec-
tion of the plug.

9

Push the end caps in place.

10 After you’ve tested the unit, you can cement the end caps (A and E) into place, if you want.

Tip

Base

Middle Section

Advertising