INSTALLATION

Continued

FLASHING INSTALLATION (V6F-10DM

OR V12F-10DM)

Determine flashing to be used with roof open-

ing chart. Slide flashing over pipe until base is

flat against roof. Replace as many shingles as

needed to cover exposed area and flashing

base. Secure in position by nailing through

shingles (see Figure 13). DO NOT NAIL

THROUGH FLASHING CONE.

Nail Only

Outer

Perimeter

of Flashing

Storm

Collar

Flashing

Cone

Underlap

Shingles

at Bottom

Overlap

Shingles Top

and Sides Only

Figure 13 - Flashing Installation

Installing Flashing on a Metal Roof

When installing the flashing on a metal roof,

it is required that putty tape be used between

the flashing and the roof. The flashing must be

secured to the roof using #8 x 3/4" screws and

then sealed with roof coating to prevent leak-

age through the screw holes. A roof coating

must also be applied around the perimeter of

the flashing to provide a proper seal.
Storm Collar Installation (SC2-1)

Place storm collar over pipe and slide down

until it is snug against open edge of flashing

(see Figure 14). Apply waterproof caulk around

perimeter of collar to provide a proper seal.

Figure 14 - Storm Collar

Chimney

Pipe

Waterproof

Caulk

Storm

Collar

Flashing

Terminations/Spark Arrestor

Fireplace system must be terminated with

listed round top or chase terminations. In any

case, refer to installation instructions supplied

with termination.

CAUTION: Do not seal open-

ings on the rooftop flashing.

Follow installation instructions

provided with termination being

used.

Secure

Termination

to Outer

Pipe with 3

Screws

RLT-12D

(Shown)

Level of

Flue Gas

Outlet

Stainless

Inner Flue

Pipe

Waterproof

Caulking

Storm

Collar

Flashing

Underlap

Shingles

Figure 15 - Termination

Overlap

Shingles (Top

and Sides of

Flashing Base)

CHASE INSTALLATIONS

Instructions for chase installations are includ-

ed with the chase style termination chosen.

In a multiple chase installation, be sure to

provide adequate distance between termi-

nations to prevent smoke spillage from one

termination to another. Terminations must be

separated a minimum of 24" center to center

and stacked at a minimum vertical height dif-

ference of 18" (see Figure 16, page 10).
Note: If a decorative shroud is to be installed,

contact the manufacturer for specifications.