Fujioh FDR-4200 User Manual

Page 7

Advertising
background image

;

7" Round Horizontal Ducting

NOTE: Provide the ducting and electrical cutouts within the shaded area

(FDR-4200D only).

23-5/8"

21-5/8"

15"

11-13/16"

18-1/8"

16-15/16"

1-3/16"

HOOD MOUNTING
SCREWS (4)

FRONT OF HOOD

BRACKET MOUNTING
SCREWS (2)

13-3/4"

DUCT COVER WIDTH

DUCT COVER HEIGHT

19-11/16"

15-3/4"

3

Run house wiring between service panel and hood location.

4

Prepare the range hood.

(1) Remove the oil receiving cover

Hold both ends of the oil receiving
cover with your hands and lift it up to
detach from the body.

(2) Remove the Rectifier Baffle Panel

Loosen the screws fixing the Rectifier
Baffle Panel, then slide the panel
upward to dislocate the temporary
fixing holes and disengage from the
catches of the body.

Oil receiving cover

Temporary

fixing hole

Catch

Rectifier Baffle Panel

7

Advertising