Duct installation, Stack extensions, System assembly – Greenheck Fan Laboratory Exhaust System Vektor-HS User Manual

Page 5

Advertising
background image

Option 1:

• No isolation damper in roof curb
• Bottom inlet on bypass air plenum

Duct Installation

Bottom Inlet Duct Connection

The end of the duct (customer-supplied) is secured
between the roof curb’s top edge and the curb cap of
either the Vektor-H or bypass air plenum. If an isolation
damper is present in the roof curb, the duct is located
between the roof curb and the damper adapter tray.

Duct Connection to Curb

Side or End Duct Connection

• Vektor-H or Vektor-HS
• With bypass air plenum

NOTE

Plenum is provided with removable side or end
panels, allowing the proper duct connection.

Duct to Bypass Air Plenum

Bypass Air

Plenum

Duct flange and

gasketing by

others

Roof Curb

Option 2:

• With isolation damper in roof curb

Vektor-H

Isolation Damper

Adapter Tray

Duct

Vektor-H or Vektor-HS

Duct

Roof Curb

Stack Extensions

Systems with multiple stack extensions require all
sections assembled and installed on site between the
main fan body and the discharge cone. Each section
has guy wire attachment brackets located on the upper
end of each section. The order sections are installed
in are universal. Gasketing (3/16 x 1/2 inch with sticky
back) is provided and is to be installed between each
joining section.

Guy wires are required on system with multiple stack
extensions. Location of connections, wiring and
anchorage is determined by a structural engineer.

1. Mount roof curb to roof deck in accordance with

local codes.

2. Install 3/16-inch thick x 1/2-inch wide, closed-cell

gasket on the top edge of the curb, adhesive side
down (gasket provided). Leave no gaps between
gasket sections to ensure tight seal.

3. Place the bypass air plenum (BAP) onto the

previously installed gasket and secured roof curb.
If a BAP is not provided for the unit, skip to Step 5.
Pre-drill pilot holes into the roof curb and attach the
BAP to the roof curb with mounting hardware (by
others).

4. Install 3/16-inch thick x 1/2-inch wide, closed-cell

gasket on the top edge of BAP, adhesive side down
(gasket provided). Leave no gaps between gasket
sections to ensure a tight seal.

5. Place the curb cap of the fan housing onto the

gasket and BAP or onto roof curb if BAP is not
provided. Attach the curb cap using the provided
5/16-inch self-tapping screws. If a BAP is not
provided, pilot holes must be drilled into the roof
curb.

6. Install the final nozzle subassemblies as shown in the

submittal drawing. Align flange bolt holes and fasten
sections using the 316 stainless steel bolts, washers,
and lock washers provided.

7. Follow electrical connection and pre-start-up checks

as listed on pages 7 and 8.

System Assembly

NOTE

When installing each section, be certain to rig each
section separately using the lifting lugs provided.

Bolt and Washer

Detail

5/16 inch self-tapping screws

5/16 inch self-tapping screws

Gasket

Gasket

Gasket

Gasket

5

Laboratory Exhaust System

®

Advertising