Check step 4, Check step 5 – Genie QuietLift 3563435770 User Manual

Page 5

Advertising
background image

For Help, call 1-800-35-GENIE or visit www.geniecompany.com

5

Mark a point at center of door and on header directly
above door. Draw a center line to connect points.

B

Find Header Bracket mounting height (Figure 4): (Do not attach

Header Bracket).

Raise door, watching top edge of door and stop door
when its edge reaches its highest point.

Measure distance (“H”) from top edge of door to floor.

For sectional doors, add 1" to “H”. Mark a point
on center line. Bottom of Header Bracket will be
installed here.

For one-piece doors, add 7" to “H”. Mark this point on
center line. Bottom of Header Bracket will be
installed here.

C

Check wall for a stud or a solid header at your mark: (If checking a

finished wall, a stud finder may be helpful).

If location is above Header, a 2" x 6" board must be
screwed to studs beside your mark with at least two Lag
Screws and Flat Washers (not provided).

Transfer your mark to new mounting board.

NOTE

For both types of doors:

– If the ceiling in your garage is so low that there

is not at least a 3" space above the Header

Bracket mounting point, contact a Genie Factory

Authorized Dealer.

If a door spring is in the way, place the Header

Bracket above the spring.

Do Not move the door

spring.

Figure 4

Find Highest Point of Travel

SECTIONAL DOOR

ONE-PIECE DOOR

HEADER

HEADER

C

HECK

D

OOR

H

EADER

A

REA

A

Find vertical center line of door and header:

Close door.

Measure door width at top.

Check Step 4:

NOTE

The header is a heavily reinforced section of the wall just

above the top of the garage door opening.

C

HECK

P

OWER

H

EAD

M

OUNTING

A

REA

Check ceiling or space above where Opener Power Head will be
mounted (Figure 5):

A

Measure from garage door center line toward rear of garage:

Approximately 11'.

B

Find location of ceiling joist or truss above where Opener Power

Head will be and estimate type and quantity of materials needed for
your installation (Figure 6).

Check Step 5:

120 Volt grounded outlet
or wiring box within 3 feet of
Power Head.

Door Center Line

Figure 5 Check Power Head location

11'

Conduit

Perforated Angle Iron

Figure 6 Mounting methods for open beam or finished ceilings

FINISHED CEILINGS

Locate ceiling joists or trusses using
a stud finder or similar device.

Attach angle iron(not included) to
joists or trusses through finish
material using Lag Screws.

OPEN CEILINGS Straps and angle
iron may attach directly to joists
or trusses.

MOUNTING EXAMPLES

55

11

30

30

55 11

30

Perforated Straps

Advertising
This manual is related to the following products: