GE E4H Series User Manual

Page 30

Advertising
background image

2.

Remove all the membrane elements from the membrane element housings in the
direction of flow, where possible. If necessary, a membrane element can be
removed against the direction of flow. A heavy duty pliers or channel lock pliers
may be necessary to pull the old membrane element our of the membrane element
housing.

3.

To reinstall replacement membrane elements, follow Steps 4 -14 (Section 4.6,
Membrane Element Installation).

NOTE: Do not operate the machine on water over 85°F (29°C).

NOTE: Do not allow the machine to freeze unless it is totally drained. The

machine must thaw a minimum of 24 hours before starting.

24

Advertising