Installation continued, Unit placement, Installation of operating unit – Garland SH/IN 5000 User Manual

Page 12

Advertising
background image

Part # 4520898 (03/31/11)

Page 12

INSTALLATION continued

Unit Placement

After the cut out has been made according to the previous

sections, apply silicone to the top of the counter and press

the induction unit into the silicone, allowing for a complete

water tight seal between the unit and the counter. Make sure

the unit is level.

Installation of Operating Unit

Each unit is supplied with a complete operating unit. In order

to fix this unit on the surface of the enclosure, a cut out for

the power switch and the LED must considered. The operator

control panel has to be fixed vertically on the installation

panel. The cable for the power switch and the LED have a

length of 39.37” (1000mm).

4.09"

[104mm]

4.09"

[104mm]

4.72"

[120mm]

4.72"

[120mm]

0"

0.55" [14mm]

0.75" [19mm]

1.73" [44mm]

4.17"

[106mm]

4.72"

[120mm]

3.66"

[93mm]

2.24"

[57mm]

3.66" [93mm]

0.08"

[2mm]

4.72"

[120mm]

4.72"

[120mm]

2.36"

[60mm]

1.50"

[38mm]

1.99"

[50.5mm]

0.31"

[8mm]

0.31"

[8mm]

4x R 0.20"[5mm]

4X counter sunk

ø 0.31"x ш 0.18"

[ш 8mm x ø 4.5mm]

4.09"

[104mm]

4.09"

[104mm]

1.10"

[28mm]

2X ш 0.20"

[ш 5mm]

ш 0.40"

[ш 10.2mm]

ш 0.33"

[ш 8.5mm]

Advertising
This manual is related to the following products: