Gateway E-9520T User Manual

Page 51

Advertising
background image

www.gateway.com

45

6

Loosen the thumbscrew (1) holding the power distribution board in place, then slide the
power distribution board (2) away from the side of the chassis to release it.

7

Lift the power distribution board (3) out of the chassis.

8

Align the new power distribution board with the power supply cage and the standoffs, then
push it down onto the standoffs.

9

Slide the power distribution board toward the side of the chassis, then tighten the
thumbscrew to secure it to the chassis.

10

Reconnect the power cables. See

“System board” on page 5

for the location of the

connectors on the system board.

11

Set the case upright, if required.

12

Reinstall the power supply modules by following the instructions in

“Replacing a power

supply module and power board” on page 43

.

13

Follow the instructions in

“Closing the server case” on page 26

.

Important

Make sure that the power supply cable box is connected to the power supply

connector(s) on the power supply(ies).

Advertising