Installation instructions, Installation, Commissioning 9 – Stovax GAZCO Linea Balanced Flue Convector Fire User Manual

Page 14

Advertising
background image

3.1.3 The remote handset must now be programmed. Push the ON /

OFF button (11), the ON or OFF display will start flashing. Then

press the ON / OFF button (11), and the (

) (10) and (

)

(13) buttons at the same time.

Immediately after press the SET button (12) once. See diagram

11.

3.1.4 The clock (7) will appear on the display. After a few seconds this

will disappear.

3.1.5 Finally push the switch back to the Locked position, towards

the rear of the appliance. The remote should now be tuned to

the control box.

3.1.6 Replace the lower cover; ensure the tabs are located on the rear

flange. Engage the front tabs at the side of the appliance and

replace the two screws. Take extreme care as to not trap any

cables when replacing the cover.
NOTE: IF A NEW HANDSET IS PURCHASED THE ABOVE

PROCEDURE MUST BE REPEATED.

3.2

Check flame picture.

3.3

Check gas pressure.

14

INSTALLATION INSTRUCTIONS

INSTALLATION

NOTE: THE HANDSET HAS BEEN FACTORY

PROGRAMMED TO OPERATE THIS FIRE. IF

THE HANDSET OR CONTROL UNIT HAS

BEEN REPLACED, YOU MUST FOLLOW THE

PROGRAMMING PROCEDURE.

3.1 Programming the handset

Section 3 must be read in total before trying to program the

hand set. The sequence must be performed while the ON /

OFF on the display is still flashing

.

3.1.1 Remove the two outer screws from the under side of the

appliance, pull the cover forward and remove. See diagram 9.

3.1.2 Working under the appliance the control box is located on the

left hand side. Using a pen or something similar push the switch

to the Unlock position. When viewed from underneath the

ON position is towards the front of the appliance. See diagram

10.

3. COMMISSIONING

9

AR1341

10

2.15 Replace the glass frame; ensure the top of the frame is

hooked on the tabs at the top of the appliance and replace
the nine screws with the three longest screws used in the
bottom fixing holes. Tighten from the top down.
HAVE YOU PURGED THE GAS SUPPLY?

2.16 Connect the gas supply to the isolation device using 8mm

pipe. Connect a suitable pressure gauge to the test point
and turn on the gas supply and check for leaks.

2.17 Light the appliance and set it to maximum. Check the

pressure corresponds to the data badge. Turn the gas off
and replace the test point screw. Turn the gas on and check
the screw for leaks.

THE YELLOW FLAMES WILL APPEAR WHEN THE FIRE
HAS GAINED SUFFICIENT HEAT - TYPICALLY 20
MINUTES.

26

1: Flame display
2: Celsius display
3: Temperature display
4: On display
5: Off display
6: Low battery display
7: Clock display
8: Auto display
9: Manual display
10: UP button
11: ON/OFF button
12: SET button
13: DOWN button

AR1665

1

2

3

10

11

5

6

7

4

8

9

12
13