Model VSU Make-Up Air

®

Unit Model Number _______________________________

(e.g. VSU-H20)

Unit Serial Number _______________________________

(e.g. 10111000)

Start-Up Date

_______________________________

Start-Up Personnel Name __________________________

Start-Up Company _______________________________

Phone Number

_______________________________

Pre Start-Up Checklist

check boxes as items

are completed.

†Check tightness of all factory wiring connections

†Verify control wiring wire gauge

†Hand-rotate blower to verify free rotation

†Verify supply voltage to the main disconnect

†Verify the supply gas pressure

†Verify remote controls wiring

†Check V-belt drive for proper alignment and

tension

Start-Up Blower Checklist

refer to Start-Up -

Blower section for further detail.

†Check line voltage

L1-L2 __________

L2-L3

__________

L1-L3

__________

†Check blower rotation

†Check for vibration

†Supply fan RPM

_________ RPM

†Motor nameplate amps

_________ Amps

†Actual motor amps

_________ Amps

†Actual CFM delivered

_________ CFM

Optional Accessories

refer to Start-Up - Blower,

Set-Up Optional Components, pg. 15 for further detail.

†Heating Inlet Air Sensor

________

Actual

Setting

Typical setting 60º-70ºF

†Cooling Inlet Air Sensor

________

Actual

Setting

Typical setting 75ºF

†Building Freeze Protection

________

Actual

Setting

Typical setting 5 minutes; 45ºF

†Dirty Filter Gauge

________

Actual

Setting

Typical setting varies

Start-Up Direct Gas (Pilot Ignition)

refer to

Start-Up - Direct Gas section for further detail.

†Check supply gas pressure

________

Maximum

________

Minimum

________

Actual

†Check Pilot Gas Pressure

________

Actual

Setting

Typical 3.0 in. wg

†Set optional High Gas Pressure Switch

________

Actual

Setting

Typical 8.0 in. wg

†Set optional Low Gas Pressure Switch

________

Actual

Setting

Typical 3.0 in. wg

†Set Burner Pressure Differential

________

Actual

Setting

Typical 0.65 in. wg

†Set the maximum firing rate

________

temp

rise

†Set the minimum firing rate

________

check

†Set the unit’s operating temperature

________

ºF

Start-Up Direct Gas (Direct Spark)

refer to

Start-Up - Direct Gas section for further detail.

†Check supply gas pressure

________

Maximum

________

Minimum

________

Actual

†Set optional High Gas Pressure Switch

________

Actual

Setting

Typical 8.0 in. wg.

†Set optional Low Gas Pressure Switch

________

Actual

Setting

Typical 3.0 in. wg.

†Set Burner Pressure Differential

________

Actual

Setting

Typical 0.65 in. wg

†Set the maximum firing rate

________

temp

rise

†Set the minimum firing rate

________

check

†Set the unit’s operating temperature

________

ºF