3 use of s2 switch, 4 use of s3 switch, 3 use of s2 switch 3.4 use of s3 switch – GE CS300 User Manual

Page 18

Advertising
background image

GEH-6639

——————— INSTRUCTION MANUAL ————————

18

S1.1

S1.2

S1.3

S1.4

ON

OFF

OFF

OFF

1.1mS +/- 10%

OFF

ON

ON

OFF

2.2mS +/- 10%

OFF

ON

OFF

ON

3.3mS +/- 10%

OFF

ON

OFF

OFF

4.4mS +/- 10%

OFF

OFF

ON

ON

5.5mS +/- 10%

OFF

OFF

ON

OFF

6.6mS +/- 10%

OFF

OFF

OFF

ON

7.7mS +/- 10%

OFF

OFF

OFF

OFF

cs080

Delay in the thyristor disabling

From the above table, considering the example, a delay of 1.1mS is selected by setting:

S1.1 OFF - S1.2 ON - S1.3 ON - S1.4 OFF.

N

OTE

!

With S1.1 ON the delay circuit for the thyristors switching off is disabled. In this case when
a mains dip occurs, the thyristors will be switched off; once mains dip is elapsed, the capacitor
precharging sequence will be executed again
(default configuration).

3.3 USE OF S2 SWITCH

Via the S2 switch it is possible to select the undervoltage threshold, which depends on the AC main voltage of
the converter. Dip S2.4 not used

Power supply voltage

S2.1

S2.2

S2.3

Threshold of the PS drop

460V -10%÷480V+10% (Default)

ON

OFF

OFF

£

370 Vdc

400V +/-15%

OFF

ON

OFF

£

300 Vdc

( 230 +10/-10% )

OFF

OFF

ON

£

180 Vdc

cs090

3.4 USE OF S3 SWITCH

The S3 switch is able to set the precharge time for the DC link capacitors (the higher precharge time, the
lower will be the current during the precharging phase to the supplied capacitors
).

Time (Seconds)

S3.1

S3.2

S3.3

S3.4

18 S +/-15%

OFF

OFF

OFF

OFF

11 S +/-15% (Default)

OFF

OFF

ON

OFF

7 S +/-15%

ON

OFF

OFF

OFF

4 S +/-15%

OFF

ON

OFF

OFF

2 S +/-15%

OFF

OFF

OFF

ON

cs100

Use the following way to select the precharge time:

Advertising