Installation, Vektor riser installation, Vk-ers marriage wall – Greenheck Fan Vektor-ERS Energy Recovery Plenum Laboratory Exhaust 474118 User Manual

Page 6: Vk-ers skirt bracket

Advertising
background image

6

Vektor ERS-MD Energy Recovery Plenum Laboratory Exhaust

5 . Set the Vektor fan bypass air plenum

Before moving the Vektor fan BAP into position,

gasketing must be installed to seal the plenum
sections against leakage.

This
gasketing is
attached to the
ERS plenum cabinet
prior to shipment. Verify
that it is in place and not
damaged or missing prior to joining
the two plenums together.

The assembly

hardware (stainless
steel bolts) required
to join the sections is
located in the Vektor
fan bypass air plenum
accessory kit.

Lift and set the Vektor fan BAP on the curb

against the ERS plenum. Follow rigging and
lifting instructions in the Vektor-MD installation
instruction (part number 464652). Push fan bypass
air plenum tight against ERS plenum, making sure
to line up bolt holes. Be certain to compress foam
gasket to form an airtight seal.

Assembly Hardware Kit

5/16 - 18 UNC x 2-1/2 lag bolts
5/16 inch flat washers
1/2 inch flat washers
3/4 inch flat washers
Quantities in hardware kit will vary

by unit size and configuration.

Roof Curb

ERS

Plenum

Cabinet

Fan Bypass

Air Plenum

(BAP)

Push

Plenum

ERS

Plenum

Cabinet

Fan Bypass

Air Plenum

(BAP)

ERS and Vektor Fan Bypass Plenum

Assembly Installed on Roof Curb

FOR GENERAL INFORMATION ONLY. CONTACT FACTORY FOR CERTIFIED DRAWINGS AND SPECIFICATIONS.

REFERENCE CAPS FOR VEKTOR-MD DIMENSIONS.

VK-ERS

SKIRT BRACKET

Attach to ERS plenum
section

Attach to fan bypass air
plenum section

Skirt Bracket

Slot Detail

Inside the ERS plenum are slots along the

marrying sections
which accept the
bolt and washer
assemblies. Using
the hardware kit,
attach the unit
sections by bolting
together frame
extrusion from the
inside.

Tighten the bolt-washer assemblies to the top

and both sides of the joining sections. Start on
the lower sides and work towards the top. As
the bolts are tightened, the plenum sections
will draw together. Use anti-seize gel to prevent
galling / welding of all stainless steel fasteners.
If necessary, pull the units together with a
mechanical come-along device at the structural
base of the unit or at lifting lugs.

External brackets, one for each side, transition

and connect lower section of the bypass air
plenum to the ERS cabinet. These brackets ship
with the BAP and also complete the connection
between the BAP and roof curb.

After the ERS plenum and Vektor fan BAP are

joined and secured, the Vektor fans can be set
on the BAP. Refer to Vektor Fan installation
instruction (part number 464652) on this
procedure.

Installation

Installations with inlet configurations that deviate from
this standard may result in reduced fan performance.
Restricted or unstable flow at the fan inlet can cause
pre-rotation of incoming air or uneven loading of the
fan wheel yielding large system losses and increased
sound levels.

Vektor Riser Installation

Check curb or structural supports for levelness. Both
must be level to ensure proper drainage from plenum
and fan(s).

Gasketing

DETAIL A

DETAIL B

FOR GENERAL INFORMATION ONLY. CONTACT FACTORY FOR CERTIFIED DRAWINGS AND SPECIFICATIONS.

REFERENCE CAPS FOR VEKTOR-MD DIMENSIONS.

VK-ERS

MARRIAGE WALL

1/2 x 1/2 inch tape

around entir

e opening

1/2 x 1/2 inch tape

around entir

e opening

Slots

around perimeter on

each side of plenum

1/2 x 2 inch tape along

outside edge of holes

Gasketing

DETAIL A

DETAIL B

FOR GENERAL INFORMATION ONLY. CONTACT FACTORY FOR CERTIFIED DRAWINGS AND SPECIFICATIONS.

REFERENCE CAPS FOR VEKTOR-MD DIMENSIONS.

VK-ERS

MARRIAGE WALL

1/2 x 1/2 inch tape

around entir

e opening

1/2 x 1/2 inch tape

around entir

e opening

Slots

around perimeter on

each side of plenum

1/2 x 2 inch tape along

outside edge of holes

Gasketing

Advertising