Checklist, Step-by-step installation instructions – GE GXRV10ABL01 User Manual

Page 18

Advertising
background image

Now That Your Reverse Osmosis System is Installed…Sanitize

Sanitize upon installation and after servicing inner parts, including replacement of prefilter,
postfilter and the Reverse Osmosis cartridge. It is important to wash hands with anti-bacterial soap
before handling inner parts of the system. See the Sanitizing the Reverse Osmosis System section.

CAUTION: If installing unit in New Construction, ensure house plumbing is flushed thoroughly before
opening the water supply valve. Also, before sanitizing, be sure to remove all cartridges as described in

the Sanitizing the Reverse Osmosis System section. Chlorine will destroy the Reverse Osmosis cartridge.

Complete Cartridge Replacement and Sanitize the System procedures (see pages 6–8), except reinstall
the filters provided with the unit.

Purge membrane. See Step 12 in Reverse Osmosis Cartridge Replacement section.

Carefully check the system for leaks.

3

2

1

Installation Checklist

1.

Are all tubing connections tightened? Do they run between the points shown? No leaks!

2.

Did you use drain option B, C or D? Make sure the 3/8

″ drain tubing, from the faucet to the drain

point, is without loops, dips or low spots.

3.

Is the water supply shutoff valve open?

4.

Did you sanitize and purge the system?

18

Step-by-step installation instructions.

Consumer Support

Tr

oubleshooting T

ips

Operating Instructions

Safety Instructions

Installation Instructions

Installation Instructions

Advertising