Pole diameters of 25mm (1”) to 50mm (2”) can be accommodated by inverting the back of the

bracket as shown in Figure 17.

Figure 17 - Mounting to pole diameters 25mm (1”) to 50mm (2”)

When adjustment is complete tighten all bolts to 14Nm (11lb ft).

Warning: Do not over tighten the bolts as bracket failure may occur.

The enclosure and mounting brackets of the PTP 600 Series Bridge product range are

capable of withstanding wind speeds up to 151mph (242kph). The installer should ensure that

the structure the bridge is fixed to is also capable of withstanding the prevalent wind speeds

and loads. See Section 11 “Wind Loading”.

The integral safety loop should be used both for hoisting the ODU up a mast or building and

into position, and also as a fixing point to secure a permanent safety lanyard from the

tower/building to the ODU in case of mounting failure.