4. installing work clamp, 5. installing gas supply – Miller Electric M-15 User Manual
Page 15
![background image](/manuals/117746/15/background.png)
OM-1314 Page 11
2-4.
Installing Work Clamp
1
Insulator
2
Bolt
3
Smaller Hole
4
Work Clamp Tabs
Bend tabs around work cable.
5
Work Cable From Unit
6
Nut
Ref. ST-025 190-D
1
2
3
4
5
6
3/8, 7/16 in
Tools Needed:
2-5.
Installing Gas Supply
Obtain gas cylinder and chain to
running gear, wall, or other station-
ary support so cylinder cannot fall
and break off valve.
1
Cap
2
Cylinder Valve
Remove cap, stand to side of valve,
and open valve slightly. Gas flow
blows dust and dirt from valve.
Close valve.
3
Cylinder
4
Regulator/Flowmeter
Install so face is vertical.
5
Gas Hose Connection
Fitting has 5/8-18 right-hand
threads. Install gas hose.
6
Flow Adjust
Typical flow rate is 20 cfh (cubic feet
per hour). Check wire manufactur-
er’s recommended flow rate.
7
CO
2
Adapter
8
O-Ring
Install adapter with O-ring between
regulator/flowmeter and CO
2
cylinder.
Tools Needed:
CO
2
Gas
7
8
3
1
2
4
5
6
1
2
3
Argon Gas
OR
ssb3.1* 12/92 – ST-158 697-A
5/8, 1-1/8 in