2-4.

Installing Work Clamp

1

Insulator

2

Bolt

3

Smaller Hole

4

Work Clamp Tabs

Bend tabs around work cable.

5

Work Cable From Unit

6

Nut

Ref. ST-025 190-D

1

2

3

4

5

6

3/8, 7/16 in

Tools Needed:

2-5.

Installing Gas Supply

Obtain gas cylinder and chain to
running gear, wall, or other station-
ary support so cylinder cannot fall
and break off valve.

1

Cap

2

Cylinder Valve

Remove cap, stand to side of valve,
and open valve slightly. Gas flow
blows dust and dirt from valve.
Close valve.

3

Cylinder

4

Regulator/Flowmeter

Install so face is vertical.

5

Gas Hose Connection

Fitting has 5/8-18 right-hand
threads. Install gas hose.

6

Flow Adjust

Typical flow rate is 20 cfh (cubic feet
per hour). Check wire manufactur-
er’s recommended flow rate.

7

CO

2

Adapter

8

O-Ring

Install adapter with O-ring between
regulator/flowmeter and CO

2

cylinder.

Tools Needed:

CO

2

Gas