OM-229 038 Page 10
3-5.
Installing Wire Spool and Adjusting Hub Tension
072573-B
When a slight force is needed to turn spool, tension is set.
24 mm(15/16 in)
Use compression spring with200 mm (8 in) spools.
Tools Needed:
3-6.
Positoning Jumper Links (230/400V 3-Phase Models)
230 V
400 V