Installing wire spool and adjusting hub tension, Positoning jumper links (230/400v 3-phase models), 5. installing wire spool and adjusting hub tension – Miller Electric OM-229 038D User Manual

Page 14

Advertising
background image

OM-229 038 Page 10

3-5.

Installing Wire Spool and Adjusting Hub Tension

072573-B

When a slight force is needed to turn spool, tension is set.

24 mm
(15/16 in)

Use compression spring with
200 mm (8 in) spools.

Tools Needed:

3-6.

Positoning Jumper Links (230/400V 3-Phase Models)

230 V

400 V

Advertising