Checking input rate, Heater parts from acf greenhouses, Figure 10 dials of typical gas meter – Modine Manufacturing GAS-FIRED HEATERS BD User Manual

Page 11: Table 4 meter-timing gas

Advertising
background image

11

10
12
14
16
18
20
22
24
26
28
30
35
40
45
50
55
60
70
80
90

100
120

180
150
129
112
100

90
82
75
69
64
60
51
45
40
36
33
30
26
22
20
18
15

360
300
257
225
200
180
164
150
138
129
120
103

90
80
72
65
60
51
45
40
36
30

720
600
514
450
400
360
327
300
277
257
240
206
180
160
144
131
120
103

90
80
72
60

1800
1500
1286
1125
1000

900
818
750
692
643
600
514
450
400
360
327
300
257
225
200
180
150

CHECKING INPUT RATE

Figure 9
Major Gas and Electric Components

Table 5
Orifice Drill Sizes with Decimal Equivalents

Dia.

Dia.

Drill

Decimal

Drill

Decimal

Size

Equivalent

Size

Equivalent

18

.1695

38

.1015

21

.1590

39

.0995

23

.1540

41

.0960

25

.1495

42

.0935

26

.1470

43

.0890

28

.1405

45

.0820

30

.1285

52

.0635

36

.1065

Main Burner Orifices

Table 6
Manifold Pressure & Gas Consumption *

Figure 10
Dials of Typical Gas Meter

Natural

Propane

BTU/Cu. Ft.

1050

2500

No. of

Model

Specific Gravity

0.60

1.53

Orifices

Manifold Pressure In. W.C.

3.5

10.0

CFH

28.6

12.0

Gal/Hr. Propane

.33

PD 30

Sec/cu. ft.

126

300

1

Orifice Drill Size

38

52

CFH

47.6

20.0

PD 50

Gal/Hr. Propane

.55

BD 50

Sec/cu. ft.

76

180

1

Orifice Drill Size

30

45

CFH

71.4

30.0

PD 75

Gal/Hr. Propane

.82

BD 75

Sec/cu. ft.

50

120

1

Orifice Drill Size

21

39

CFH

95.2

40.0

PD 100

Gal/Hr. Propane

1.15

BD 100

Sec/cu. ft.

38

90

2

Orifice Drill Size

30

45

CFH

119.0

50.0

PD 125

Gal/Hr. Propane

1.43

BD 125

Sec/cu. ft.

30

72

2

Orifice Drill Size

26

43

CFH

138.1

58.0

PD 150

Gal/Hr. Propane

1.64

BD 150

Sec/cu. ft.

26

62

2

Orifice Drill Size

21

39

CFH

166.7

70.0

PD 175

Gal/Hr. Propane

1.86

BD 175

Sec/cu. ft.

22

51

3

Orifice Drill Size

28

43

CFH

190.5

80.0

PD 200

Gal/Hr. Propane

2.19

BD 200

Sec/cu. ft.

19

45

3

Orifice Drill Size

25

42

CFH

238.1

100.0

PD 250

Gal/Hr. Propane

2.74

BD 250

Sec/cu. ft.

15

36

3

Orifice Drill Size

18

36

CFH

285.7

120.0

PD 300

Gal/Hr. Propane

3.29

BD 300

Sec/cu. ft.

13

30

4

Orifice Drill Size

21

39

CFH

333.3

140.0

PD 350

Gal/Hr. Propane

3.84

BD 350

Sec/cu. ft.

11

26

5

Orifice Drill Size

23

41

CFH

381.0

160.0

PD 400

Gal/Hr. Propane

4.38

BD 400

Sec/cu. ft.

9

23

6

Orifice Drill Size

25

42

Table 4
Meter-Timing Gas

(Time required for one revolution is charted for various size
meter dials and various rates of gas input in cu. ft. per hour. To
convert to Btuh, multiply by the heating value of the gas used.)

Time for 1

Revolution,

Sec.

1/2 cu. ft.

1 cu. ft.

2 cu. ft.

5 cu. ft.

Input, Cu. Ft. per Hour, When Meter Dial Size is:

*Above gases based on average standards. Units can be furnished
for gases of different values and specific gravities. (Gal./Hr. based
on 60°F. 30" Hg., 91,500 BTU/Gal.) In Canada, refer to rating plate
on side of unit for orifices at high altitude.

Pilot Orifice Identity Numbers

Pilot Burner

Identity No.

Identity No.

Manufacturer

Natural Gas

Propane Gas

Honeywell

BCR-18

BBR-11

Robertshaw

Johnson

7715

4710

1

8

N

1

O

P

L

As number appears on top of pilot orifice.

PILOT TUBING

FAN

GUARD

FAN MOTOR

COMBINATION

GAS CONTROL

IGNITION

CONTROL

CONTROL

TRANSFORMER

JUNCTION

BOX

TERMINAL

BOARD

ENTRANCE FOR

COMBUSTION AIR

Heater Parts from ACF Greenhouses

Advertising