10. Apply Loctite 242 and torque the mounting screw that

secures the spacer between the battery mount bracket
and base frame. Torque to 160-inch pounds.

11. Reassemble large wheel to hub assembly and Torque

to 160-inch pounds.

12. Repeat this procedure for the opposite shock.

13. Reinstall the battery box. Refer to INSTALLING/RE-

MOVING GROUP 22 BATTERY BOX in PROCE-
DURE 9 of this manual.

FIGURE 6 - SHOCK REPLACEMENT - GROUP 22

BATTERY BASE FRAMES

Shock

Base Frame

Flat Washer

Locknut

Spring

Washer

NOTE: Top of stabilizer exploded away for clarity only.

*NOTE: The spring shown on the stabilizer is for wheel-
chair models built before 7/1/1999

Inner Link Spacer

Mounting

Screw

Stabilizer*

Mounting

Screw

Stabilizer Bracket

Suspension

Arm

Battery Mount Bracket

B. (Group 22 Battery Base Frames) Loosen the

mounting screw that secures the battery box
spacer between the battery box tray mount bracket
and the base frame.

3. Remove the mounting screw that secures the top of

the stabilizer cylinder to the base frame.

4. Perform one (1) of the following:

A. (Group 24 Battery Base Frames) Remove the

mounting screw that secures the top of the shock
between the battery box sub-frame and the base
frame.

B. (Group 22 Battery Base Frames) Remove the

mounting screw that secures the top of the shock
between retainer clip and the battery box tray
mount bracket and the base frame.

NOTE: (Group 24 Battery Base Frames Only) Remove
and hold onto the retainer clip for reinstallation of shock.

5. Swing the top of both the stabilizer cylinder and the

shock forward.

6. Hold the spring retainer and turn the shock eyelet as-

sembly COUNTERCLOCKWISE to unthread it from
the shock.

7. Remove the spring retainer and spring.

8. Place the NEW spring onto the shock.

9. Reinstall the shock eyelet assembly and the spring

retainer onto the NEW spring.

10. While holding the spring retainer, torque the shock

eyelet assembly to 245-inch pounds.

11. (Group 24 Battery Base Frames) Position the re-

tainer clip between the shock and the battery box sub-
frame making sure the retainer clip mounting hole is
towards the bottom and the closed end of the clip is
against the battery box retainer.

12. Perform one (1) of the following:

A. (Group 24 Battery Base Frames) Apply Loctite

242 and torque the mounting screw that secures
the battery box retainer to the base frame to 160-
inch pounds.

B. (Group 22 Battery Base Frames) Apply Loctite

242 and torque the mounting screw that secures
the battery mount bracket to the base frame to
160-inch pounds.

13. Secure the top of the shock and retainer clip (Group

24) to base frame. Apply Loctite 242 and torque to
160-inch pounds.

SHOCK SPRING REPLACEMENT
(FIGURE 7)

NOTE: Heavy Duty Models Only. Shock springs on stan-
dard models cannot be individually replaced. A new shock
assembly must be installed. Refer to SHOCK REPLACE-
MENT in this procedure of the manual.

1. Remove the front battery box. Refer to INSTALLING/

REMOVING GROUP 24 BATTERY BOXES or IN-
STALLING/REMOVING GROUP 22 BATTERY BOX
in PROCEDURE 9 of this manual.

2. Perform one (1) of the following:

A. (Group 24 Battery Base Frames) Loosen the

mounting screw that secures the battery box re-
tainer between the battery box sub frame assem-