Classic he, 15 installation, 9packaging and casing removal – IDEAL INDUSTRIES CLASSIC HE18 User Manual

Page 15: 10 determining the flue length, Inst alla tion

Advertising
background image

classic HE -

Installation & Servicing

15

INSTALLATION

1. Cut straps and remove outer carton.
2. Remove packing from top of boiler (Note the wall mounting

plate is packed on this packing)

3. Leave bottom packing in place.
4. Slightly open plastic controls door to gain access to the front

panel fixing screws.

5. Remove the front casing as follows and place to one side to

avoid damage.
a. Undo the 2 front casing retaining screws (a) retaining the

casing to the back panel.

b. Lift the bottom of the front of the boiler casing up slightly then

unhook from the top.

6. Remove the hardware pack from the inside of the boiler
7. Remove the boiler from its packaging base. But do not

remove bottom packaging. The boiler may now be stood
upright on its controls support protection frame to ease
handling and installation.

8. Unpack the boiler terminal box (pack 'B') and, if applicable, the

extension flue box(es) (pack 'D').

9

PACKAGING AND CASING REMOVAL

FLUE KITS
Pack B:
supplied as standard.

Pack D: optional extension kit for side flue or vertical flue outlet.
Refer to Frame 28.

Side Outlet Kit: For side outlet applications. Refer to Frame 20-
27.

1. A maximum of 3 extension ducts (plus the standard flue duct)

may be used together.

2. Flue extensions of greater than 1m (39") should be supported

with the bracket provided.
90

o

Elbow kit (equivalent flue length resistance = 1.5m)

45

o

Elbow kit (equivalent flue length resistance = 1.0m)

10 DETERMINING THE FLUE LENGTH

Note.
A roof flue kit is available as an optional extra for
vertical flue installation, supplied with separate
fitting instructions. Refer to Frames 31 to 35.

Flue length

for rear

190mm

190mm

Y

X

Jacking screw for
boiler alignment

REAR FLUE

INSTALLATION

SIDE FLUE

INSTALLATION

CLA7636

It is MOST IMPORTANT that the boiler is installed
in a vertical position.

cla7630

(a) Casing

retaining screws

Front panel

Packaging base

Controls pod casing

* Measured from centre line of boiler to outside of wall.

Note. The flue duct MUST be inclined at 1.5 degrees to the
horizontal to allow condensate to drain back into the boiler and
out through the condensate drain. (Only necessary if using one or
more ‘D’ extension duct packs)

Flue length mm*

Accessories

From 75 up to 705 (Rear flue)

or

B Pack 1 off

From 270 up to 775 (Side flue)

775 to 1680

B Pack 1 off + D Pack, 1 off *

1680 to 2585

B Pack 1 off + D Pack, 2 off *

2585 to 3000

B Pack 1 off + D Pack, 3 off *

B Pack Product No. 201 816
D Pack Product No. 201 180
Side Outlet Kit Product No. 201 866

* Side flue only

INST

ALLA

TION

201850-6.pmd

21/02/2008, 12:58

15

Advertising
This manual is related to the following products: