B.2 setup, B.2.1 hardware setup – Intel IQ80333 User Manual

Page 55

Advertising
background image

Customer Reference Board Manual

55

Intel® IQ80333 I/O Processor

Getting Started and Debugger

B.2

Setup

B.2.1

Hardware Setup

Use

Figure 14

and the rest of the Intel

®

80333 I/O Processor Evaluation Platform Board Manual, to

set up the hardware.

Connect the Raven to the host via the parallel port and to the evaluation board via the 20-pin
JTAG connector.

Note:

The parallel port must be configured to EPP mode for the Macraigor Raven to work properly.

The parallel port setting can be changed in the BIOS setup program or in Control Panel. More
information on the Raven can be found at the Macraigor web site. Test software for the Raven is free
and available for download at:

http://www.ocdemon.net/Merchant2/merchant.mv?Screen=CTGY&Store_Code=MTS&Category_C
ode=pinouts

.

Connect a serial cable from the evaluation board to the host.

Note:

The serial cable connects to the evaluation board with an RJ11 connector and connects to the host
computer serial port via an RJ11 to DB9F adaptor. The serial port configuration is covered in the
configuration section below.

The 80333 plugs into a bus master PCI Express slot on the backplane or platform.

Figure 14.

Intel

®

80333 I/O Processor Hardware Setup Flow Chart

Serial Cable

Parallel Port Cable

20-Pin JTAG Connector

Host

JTAG

Evaluation Board

Backplane or PCI-X Platform