IBM C2B 2.25 Brick On Sled carrier 128-pin HPC User Manual

Page 17

Advertising
background image

USER RESPONSIBLE F O R V E R I F Y I N G VERSION A N D COMPLETENESS

O E M F U N C T I O N A L SPECIFICATION ULTRASTAR X P (DFHC) SSA M O D E L S 1.12/2.25 GB - 1.0" H I G H

Example 4. Calculate the 12 volt peak current.

To compute the sum of the 12 volt peak currents the following is done.

mean

+ 1 2 V D C (idle avg)

0.28

amps

+ 1 2 V D C (seek peak)

1.2

amps

TOTAL

1.48

amps

Example 5. Calculate the mean plus 3 sigma 12 volt peak current.

To compute the sum of the 12 volt peak current's 1 sigma value assume all distributions are normal. There-
fore the square root of the sum of the squares calculation applies.

sigma

+ 1 2 V D C (idle avg)

0.02 amps

+ 1 2 V D C (seek peak)

0.02 amps

TOTAL sqrt((0.02)**2+(0.02)**2)=0.028 amps

So the mean plus 3 sigma peak current is 1.48 + 3*0.028 = 1.56 amps

Things to check when measuring 12 V supply current:

Null the current probe frequently. Be sure to let it warm up.

Adjust the power supply to 12.00 V at the drive terminals.

Use a proper window width, covering an integral number of spindle revolutions.

Measure values at 25 degree C casting temperature.

Get a reliable trigger for Seek Peak readings.

Source filename=POWER

IBM Corporation

Page 17 of 87

Advertising