C.2.3 step 3 - configuring and uploading files, Step 3 - configuring and uploading files, 6whs &rqiljxulqj dqg 8sordglqj )lohv – Siemens CP 1515 User Manual
Page 250
Advertising

'RLQJ D )RUFHG 5HORDG
250
Industrial Ethernet Wireless LAN RLM Manager, CP 1515 Manager
C79000-G8976-C171-01
5. After approximately 5 seconds, use the small pointed object again to
press the
5HORDG
button for approximately 30 seconds.
You will see the LEDs changing color in the range Amber, Red and Green
again.
6. When all LEDs turn Amber, release the
5HORDG
button.
The Power LED turns to Amber. Other LEDs will be off, or may flicker
Green to indicate LAN activity on the associated interface.
7.
Start the RLM Manager program and proceed with
& 6WHS &RQILJXULQJ DQG 8SORDGLQJ )LOHV
The complete configuration and upload procedure of the forced reload
procedure is pictured in
Advertising