Sharp OZ-5600 User Manual

Page 123

Advertising
background image

120

Deleting a line

1.

Move to the line you want to delete using

PREV

.

2.

Press

DEL

.

The selected line is removed from the display.

3.

Press

ENTER

to get the new total.

Calculating dates

As well as performing standard arithmetic calculations, the
Calc application lets you determine the period of time (in
days) between two specific dates, and also what the date
will be a certain number of days before or after a particular
date.

Calculating the number of days between two dates

1.

Press

CALC

a few times until the date calculator

appears.

The current date appears as the default starting date.

Follow step 2 below if you wish to change the starting date.
If you want the calculation to start from the current date,
skip step 2 instead.

#6-1-4 Display

2.

Press

CANCEL

once to clear the starting date field

and then enter the desired starting date. Prefix a
single-digit month or day with a “0”.

3.

Press

˜

.

4.

Enter the ending date.

5.

Press

=

.

If you wish to have today’s date as the ending date
(when the starting date is prior to today), use

2nd

D

to enter today’s date.

The number of days between the two dates is shown.

+

If you make a mistake, press

CANCEL

to return to

a previous step.

If you enter an invalid date or other value, for
example if you forget to enter the year, the
operation will not be performed and nothing will
happen when you press

ENTER

.

Calculating a date by specifying a number of days

1.

Press

CALC

a few times until the date calculator

appears.

The today's date appears as the default starting date. If you
want to calculate a date starting from today's date, skip the
next step.

Starting date

Advertising