Tower Installation

These installation instructions are intended to help you prepare before
your tower arrives. If discrepancies exist between these instructions
and those shipped with the tower, the instructions shipped with the
tower will govern.

1. Prior to placement of the tower, confirm that the supporting platform is

level, and that the anchor bolt holes are correctly located in accordance
with Marley drawings.

2. Place bottom module on your prepared supports, aligning anchor bolt

holes with those in your supporting steel. Make sure that the orientation
agrees with your intended piping arrangement. Attach tower to supporting
steel with four

5

8

" diameter bolts and flat washers (by others). Position

flat washers between the bolt head and the tower bottom flange.

3. Before setting top module in place on bottom module, clean any de-

bris from the top of the bottom module. Ensure that the fill surface is

free from debris and all fill packs are level. Recommended tie-down

instructions are provided to the truck driver upon tower pickup. If dam-

age occurs to the tower due to tie-down procedures other than those

recommended in the drawing, it should be noted upon arrival. Remove

the protective paper off the sealing gasket tape before setting the top

module and ensure there is coverage around the entire perimeter. Place

the top module on the bottom module, aligning mating holes as it is

set in place. Make sure that the orientation of the top module agrees

with your intended piping arrangement. Sections are 180° reversible

with respect to each other. Pay close attention to face designations

on sales orientation drawings e.g. Face A, Face B, etc. Use drift pins

to align bolt holes during the assembly of the top and bottom modules

as the top is lowered into place. Use care when setting the modules as

lifting and resetting the top module will compromise the sealing gasket

between the two sections, possibly resulting in a leaking joint. If the

top module must be reset, it may be necessary to remove the sealing

gasket tape and replace.

Gasket details must be followed correctly or leaks may occur that
will not be covered under warranty.

4. Attach top module to bottom module with fasteners provided—according

to “MD Field Installation Manual”.