Sharp SF-1120 User Manual

Page 68

Advertising
background image

B. DB blade replacement (Replace every 120K copies.)

1

Remove the old DV blade from the DV cover. (Remove the duplex
tape.)

2

Attach the new DV blade with the pasteboard as shown below.
(Attach the DV blade to the reference of A and the inscribed line
(

0.2). Do not allow extrusion from the edge. Do not allow

covering the inscribed line. The allowable reference shift is within
0.5mm from the inscribed line. Attach the sheet without being
wavy.

3

Remove the base pasteboard from the DV blade.

Note: If the pasteboard is not removed, the drum is scratched.

C. V ring attachment

Be careful of the direction of the V ring when attaching it to the MG
roller and the MX roller.

1

As shown above, be careful of the direction of the V ring.

2

Do not allow clearance at section (A) between the V ring and each
roller.

3

Attach the MG roller and the right V ring as shown in the figure.
(3.0

0

+

5

)

@

Note: When replacing the MG roller, attach the plate MFE.

Do not allow contact between

φ

6.5 hole in the plate MFE and the

magnet fixing shaft.
Remove oil and dirt from the attachment section.

@

Note: When attaching the MG roller, put the milled surface up.

D. Note for toner hopper drive gear (31T) and stirring

shaft attachment

Be careful of the stirring shafts A and B attachment positions.

Attach so that the angle between stirring shaft A and B is 90
degrees.

When attaching the toner hopper drive gear (31T), be careful of
the E-ring stop position as shown below. (If the E ring is on the
milled surface, it is apt to disengage.)

DV cover

DV blade

3.0

+0.5
-0

Plate MFE

V ring

V ring

Section A

(MG roller)

(MX roller)

Section A

V ring

V ring

Section A

φ

6.5

Plate MFE

MAG roller

Magnet fixing shaft

90

Stirring shaft B

Stirring shaft B

31T gear

6 – 21

Advertising
This manual is related to the following products: