Kohler Command CV730 User Manual

Page 160

Advertising
background image

9.4

Section 9
Disassembly

Figure 9-11. Air Cleaner Bracket/Valve Cover
Mounting Screws (Two-Barrel Model Pictured).

Heavy Duty Air Cleaner

1. Disconnect the breather hose from the fitting in

adapter or elbow. Remove the hex flange nuts
securing the adapter and any attached clips to the
mounting studs. See Figure 9-10.

Figure 9-13. Removing Heavy Duty Air Cleaner
Assembly (Two-Barrel Model Pictured).

Remove Control Panel (If So Equipped)

1. Disconnect the Oil Sentry™ Indicator Light wires.

2. Disconnect the choke control cable from the

throttle control bracket.

3. Disconnect the throttle control bracket from the

cylinder head. See Figure 9-14.

4. Remove the panel from the blower housing. See

Figure 9-15.

4. Remove the two upper screws securing the air

cleaner mounting bracket to the blower housing
and remove the air cleaner assembly. See Figures
9-12 and 9-13.

Figure 9-10. Removing Breather Hose, Hex Nuts
and Adapter Elbow (Two-Barrel Model Pictured).

2. Pull the adapter elbow and gasket off the

mounting studs.

3. Remove the four screws (inner two valve cover

screws on each side) securing the air cleaner main
support bracket. Do not lose any of the mounting
hardware.

Two-Barrel Carburetor Models only: Unhook the
choke return spring from the bottom of the air
cleaner mounting bracket. See Figure 9-11.

Hex
Nuts

Adapter Elbow

Breather
Hose

Choke Return Spring

Figure 9-12. Removing Upper Mounting Screws.

Upper Mounting Screws

Main Bracket Mounting Screws

Advertising
This manual is related to the following products: