Kohler Command CV730 User Manual

Page 208

Advertising
background image

11.21

Section 11

Reassembly

11

Figure 11-73. Throttle Linkage Details.

3. Move the governor lever toward the carburetor as

far as it will go (wide-open throttle) and hold in
position.

4. Insert a nail into the hole on the cross shaft and

rotate the shaft counterclockwise as far as it will
turn, then torque the hex nut to 6.8 N·m
(60 in. lb.)
.

5. Reconnect the lead wire to the fuel shut-off

solenoid if so equipped.

6. Install the lower support control bracket if

equipped with a control panel. See Figure 11-74.

Figure 11-72. Choke Linkage Details (Two-Barrel
Models).

Figure 11-75. Installing Control Panel.

8. Assemble the throttle control shaft to the control

bracket.

9. Assemble the choke control to the control bracket.

Figure 11-74. Installing Lower Support Control
Bracket.

7. Secure the control panel to the blower housing

with the two screws (Models without a Heavy-
Duty Air Cleaner). See Figure 11-75.

Bushing

Lever

Choke
Linkage

Advertising
This manual is related to the following products: