Maintenance, Routine and periodic maintenance warning warning – Lincoln Electric SQUARE WAVE TIG 255 SVM100-A User Manual

Page 30

Advertising
background image

D-1

MAINTENANCE

SQUARE WAVE TIG 255

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

ELECTRIC SHOCK can kill.

• Only qualified personnel should

perform this maintenance.

• Turn the input power OFF at the

disconnect switch or fuse box
before working on this
equipment.

• Do not touch electrically hot

parts.

To avoid receiving a high frequency shock, keep the
TIG torch and cables in good condition.

1.

Disconnect power supply lines to machine before
performing periodic maintenance.

2.

Periodically clean the inside of the machine with a
low pressure air system. Be sure to clean the fol-
lowing components thoroughly. See Figure D.1
for location of those components.

• Main Transformer
• Output Terminals
• Polarity Switch
• Rectifier Assembly
• Control Box Assembly
• Spark Gap Assembly
• Protection PC Board -

(Mounted to rear of control box assembly)

3.

Inspect welder output and control cables for
fraying, cuts, and bare spots.

4.

Keep TIG torch and cables in good condition.

5.

The fan motor has sealed ball bearings which
require no maintenance.

6.

Inspect spark gap spacing at regular intervals to
maintain a 0.015 in (0.4mm) gap. (Smallest
possible air gap consistent with good welding is
desirable to minimize R.F.I. problems.) Dressing
or any refinishing of the spark gap contacts is not
recommended. If the contact surfaces become
irregular or completely eroded, replacement of both
electrodes is recommended.

MAINTENANCE

SAFETY PRECAUTIONS

ROUTINE AND PERIODIC
MAINTENANCE

WARNING

WARNING

Advertising