Troubleshooting & repair, Continued), Static scr test – Lincoln Electric SQUARE WAVE TIG 255 SVM100-A User Manual

Page 68

Advertising
background image

SQUARE WAVE TIG 255

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

F-27

TROUBLESHOOTING & REPAIR

STATIC SCR TEST

(continued)

PROTECTION/SNUBBER

L9255

J10

J11

J12

J13

J14

J15

REMOVE PLUGS J10 & J13

TEST PROCEDURE

1.

Remove main supply power to machine

2.

Remove plug J10 and J13 from the pro-
tection/snubber board. Refer to Figure
F.11.

3.

Remove red insulating paint from heat
sink test points. See Figure F.12. DO
NOT DISASSEMBLE THE HEAT
SINKS.

4.

Using an analog ohmmeter test the
resistance from anode to cathode of

FIGURE F.11 - PROTECTION BOARD PLUG LOCATIONS

SCR1
ANODE

CATHODE
(1 & 2)

SCR2
ANODE

SCR3
CATHODE

SCR4
CATHODE

ANODE
(3 & 4)

PLUG
P10

FIGURE F.12 - SCR TEST POINTS.

SCR1. Reverse the meter leads and
check from cathode to anode of SCR1.

A. If a low resistance is indicated in

either direction SCR1 is faulty.
Replace SCR assembly.

5.

Repeat Step 4 testing SCR2, SCR3 and
SCR4.

To further check the SCR’s functions
use an SCR tester and proceed to
active SCR test.

Advertising