Complete installation remove bypass jumpers – Lutron Electronics LCP128 User Manual

Page 17

Advertising
background image

R

Installation Guide for Dimming and Switching Panels 17

A. After all load wiring has been checked, turn

circuit breakers OFF.

B. Remove and store the bypass jumpers for

possible future use.

C. Turn circuit breakers ON.

Note. All circuits are now set to the default
Non-Dim load type. Non-Dim load types will
respond by immediately going to full ON in
any lighting scene (except the OFF scene).

Caution! Reuse the bypass jumpers
whenever work is being done on a load.
Damage caused by short-circuits and
miswiring is not covered by the product
warranty.

DH

DH

DH

DH

H

N

N

N

N

N

Bypass jumper

Panel installation, control station wiring, and load activation are now complete.
Next Step: Refer to the Setup and Operation Manual to set up the functions and operation of the panel.

Module with 4 outputs shown

Complete Installation

Remove Bypass Jumpers

You have completed your panel installation.

For Onsite Factory Commissioning, call Lutron Technical Support and select Startup to schedule a field service
visit. Allow for 10 working days between day of call and scheduled visit.

If you purchased Telephone Startup (LCP128 only), stop here and complete the Control Location, Panel, and
Control Station Tables that are located in the back of the Setup and Operation. Once the tables are complete, call
Lutron Technical Support and select Startup. Please call 24 hours prior to desired system startup.

In the U.S., Canada, and the Caribbean: 1.800.523.9466
In Mexico: +1.888.235.2910
In Europe: +44.207.702.0657
In Asia: +65.6220.4666
In Japan: +81.355.758.411
In all other countries: +1.610.282.6701

CC

hhiinn

eess

ee

Advertising