Installing the cover, Connecting the cables, Installing – Lenovo RD120 User Manual

Page 89: Cover, Connecting, Cables

Advertising
background image

4.

Install

the

server

in

a

rack.

See

the

Rack

Installation

Instructions

that

come

with

the

server

for

complete

rack

installation

and

removal

instructions.

5.

To

attach

peripheral

devices

and

connect

the

power

cords,

see

“Connecting

the

cables.”

Attention:

In

a

dc

power

environment,

only

trained

service

personnel

other

than

Lenovo

service

technicians

are

authorized

to

connect

or

disconnect

power

to

the

dc

power

supply.

See

the

documentation

that

comes

with

each

dc

power

supply.

Installing

the

cover

To

install

the

cover,

complete

the

following

steps:

1.

Place

the

cover-release

latch

1 in

the

open

(up)

position.

2.

Insert

the

bottom

tabs

of

the

top

cover

into

the

matching

slots

in

the

server

chassis.

3.

Press

down

on

the

cover-release

latch

to

lock

the

cover

in

place.

4.

Slide

the

server

into

the

rack.

Connecting

the

cables

The

following

illustrations

show

the

locations

of

the

input

and

output

connectors

on

the

front

and

rear

of

the

server.

Front

view

1

USB

5

connector

2

USB

6

connector

3

Video

connector

Chapter

2.

Installing

optional

devices

75

Advertising