Life Fitness GS2 User Manual

Page 15

Advertising
background image

15

S

TEP

13:

Refer to cable ILLUSTRATION “A” on page 14 for cable routing while installing pulleys.

• Assemble two 3-1/2” PULLEYS (24) into FRAME (1) using two 3/8 X 3-3/4” BOLTS (30),

four 3/8 X 1-1/16” FLANGE SPACERS (42) and two 3/8” LOCK NUTS (34) and tighten securely.

• Assemble one 3-1/2” PULLEY (24) into PRIMARY PIVOT (9) upper hole using one 3/8 X 8-3/4”

BOLT (31), two 3/8” FLAT WASHERS (36), two 3/8 X 1-1/2” SPACERS (44) and one 3/8” LOCK-
NUT (34) and tighten securely

9

34

36

24

42

44

31

30

1

3/8 X 3-3/4”

3/8 X 8-3/4”

0

1

2

3

4

5

6

1/2

1/2

1/2

1/2

1/2

1/2

F

IGURE

13

Advertising