Life Fitness GS2 User Manual
Page 15
Advertising
15
S
TEP
13:
• Refer to cable ILLUSTRATION “A” on page 14 for cable routing while installing pulleys.
• Assemble two 3-1/2” PULLEYS (24) into FRAME (1) using two 3/8 X 3-3/4” BOLTS (30),
four 3/8 X 1-1/16” FLANGE SPACERS (42) and two 3/8” LOCK NUTS (34) and tighten securely.
• Assemble one 3-1/2” PULLEY (24) into PRIMARY PIVOT (9) upper hole using one 3/8 X 8-3/4”
BOLT (31), two 3/8” FLAT WASHERS (36), two 3/8 X 1-1/2” SPACERS (44) and one 3/8” LOCK-
NUT (34) and tighten securely
9
34
36
24
42
44
31
30
1
3/8 X 3-3/4”
3/8 X 8-3/4”
0
1
2
3
4
5
6
1/2
1/2
1/2
1/2
1/2
1/2
F
IGURE
13
Advertising