PVI Industries QuickDraw PV500-24 User Manual

Quickdraw, Installation & maintenance manual for

Advertising
background image

PV500-24 03-99

Section 24

1

INSTALLATION & MAINTENANCE MANUAL FOR

QuickDraw

INSTANTANEOUS

ENERGY: WATER TO WATER

U-TUBE SINGLE-WALL & DOUBLE-WALL HEAT EXCHANGERS

TYPICAL CONSTRUCTION

FIGURE 24-1

1. U-tube Heat Exchanger

9. Boiler Water Temperature Gauge *

2. Boiler Water Inlet

10. Tridicator *

3. Boiler Water Pump

11. Flow Switch *

4. Control Enclosure

12. Relief Valve (AGA optional)

5. Intratank Circulator

13. Tank Purge Valve *

6. Potable Water Inlet

14. Boiler Water Outlet

7. Potable Water Outlet

15. Check Valve

8. Tank Drain

* Optional


CAUTION: TEMPERATURES HIGHER THAN 125

°F. INCREASE THE RISK OF SCALD INJURY!


IMPORTANT: Clearances for servicing and inspection are 18” at top, sides and rear and a

minimum of one tank diameter in front.

Advertising