Installing for suntouch, Power center – Pentair Light Direct Connect Kit User Manual

Page 5

Advertising
background image

Light Direct Connect Fitting Installation Guide

5

Installing for SunTouch

Power Center

1.

To access the SunTouch Power Center electronics compartment,
unlatch the front door and loosen the retaining screw on front
panel. Open the hinged front panel to access the electronics
compartment.

2.

Proceed to “Installing the Light Direct Connect Fitting Using Non-
Metallic (PVC) Conduit” (page 6), or “Red Brass Conduit”
for
installation instructions” (page 9).

3.

After the Light Direct Connect installation has been completed,
close the front panel and secure it with the retaining screw.

SunTouch Power Center (Bottom view)

Front panel
retaining screw

¾" conduit knockout

SunTouch Power Center

CAUTION: THE
LIGHT DIRECT
CONNECT FITTING
MUST BE INSTALLED
ON THE BOTTOM OF
THE LOAD CENTER
AND ORIENTATED
DOWNWARDS ONLY.

T

Note: Each light circuit
must be connected to a
25 AMP (maximum) circuit
breaker in the load center,
when the Light Direct
Connect is installed.

Advertising