Powerware 9135 Two-in-One UPS 5000/6000 VA User Manual

Page 34

Advertising
background image

INSTALLATION

EATON Powerware

®

9135 Two−in−One UPS (5000/6000 VA) User’s Guide

S 164201726 Rev 1

www.powerware.com

28

11. Optional. Install the rear hold−down brackets (included with the rail

kit) if you need to move the rack enclosure with the UPS already
rack−mounted inside (see Figure 8).

Figure 8. Installing the Rear Hold−Down Brackets

12. Slide the UPS and any optional EBMs into the rack.

13. Secure the front of the cabinet to the rack using two M6

12 mm

round−head screws on each side (see Figure 9).

Figure 9. Installing the Cabinets

Advertising