Rpo installation – Powerware 9135 Two-in-One UPS 5000/6000 VA User Manual

Page 43

Advertising
background image

INSTALLATION

EATON Powerware

®

9135 Two−in−One UPS (5000/6000 VA) User’s Guide

S 164201726 Rev 1

www.powerware.com

37

RPO Installation

Installation of the RPO function must be carried out in compliance with
applicable regulations. The cable is not included.

In order to fully de−energize devices and the Powerware 9135 with the
RPO port, it is necessary to:

S

Use a two−position switch (normally−open or normally−closed contact
and held more than one second).

S

Connect this RPO switch to a device that trips all breaker(s) located
upstream

(1)

and downstream

(2)

the Powerware 9135 UPS. This can

be achieved by means of a shunt trip:

(1)

If not, the output devices could be powered again through static

switch when the two−position switch is released.

(2)

If not, the output devices will remain powered several seconds

after the RPO activation.

NOTE The internal batteries will remain connected to the power module after RPO
activation.

RPO Contact Normally−Open

RPO Contact Normally−Closed

5 Vdc to 27 Vdc

5 Vdc to 27 Vdc

RJ−12 (6p6c)

RJ−12 (6p6c)

Figure 19. RPO Communication Port

S

Signal:

Activation voltage: 5 Vdc to 27 Vdc

Current: 10 mA maximum

Advertising