Chapter 2 configuration and installation, Board configuration, Board configuration -1 – National Instruments SC-2040 User Manual

Page 15

Advertising
background image

© National Instruments Corporation

2-1

SC-2040 User Manual

Chapter 2
Configuration and Installation

This chapter describes the configuration and installation of your SC-2040. The topics discussed
are switch and jumper configuration, connection of the SC-2040 to the MIO-16E, and the power-
on sequence for your SC-2040 configuration.

Board Configuration

The SC-2040 has 10 jumpers, eight DIP switches, and one slide switch that you use to configure
the board. These switches and jumpers are shown in Figure 2-1.

Advertising