Unpacking the passport 8250 shipment, Taking inventory of the passport 8250 shipment – Nortel Networks Passport 241-5101-200 User Manual

Page 22

Advertising
background image

22 Chapter 2 Preparing for the hardware installation

241-5101-200 R2.2

— Access is through the use of a special tool, or lock and key, or other

means of security, and is controlled by the authority responsible for
the location.

Unpacking the Passport 8250 shipment

Move the Passport 8250 package to the installation site to unpack the
shipment. If any equipment is damaged, contact your Nortel Networks
representative.

1

Cut the tape that seals the top flaps, taking care not to cut into the contents
of the box, and fold back all four flaps.

2

Remove foam and any other packaging material from the top of the unit.

3

Lift the Passport 8250 unit from the box and place it horizontally on a flat
surface.

4

Unpack any other equipment shipped with the unit.

5

Clear the unpacking area of all debris.

Taking inventory of the Passport 8250 shipment

After you unpack the Passport 8250 shipment, take inventory of the items
using the “Inventory checklist” (page 23) to ensure you received all the items
ordered. If you are missing an item, contact your Nortel Networks
representative.

Note: NMS software and documentation are not included in the
inventory checklist.

CAUTION

Risk damage to the equipment

You risk damage to the equipment if the installation site
fails to meet all environmental considerations.

Advertising
This manual is related to the following products: