Rear panel, Initial setup, Rear panel -5 – NETGEAR ReadyNAS 2100 User Manual

Page 15: Initial setup -5

Advertising
background image

ReadyNAS 2100 User Manual

Getting Acquainted

1-5

v1.1, June 2009

Rear Panel

1. System exhaust fans.

2. Power on off switch.

3. Power cable socket.

4. Disk exhaust fans.

5. Two USB ports.

6. LAN1 and LAN2 gigabit Ethernet ports.

Initial Setup

Follow the instructions in the NETGEAR Installation Guide that came with your unit to install it.
An electronic copy of the installation guide is on the product CD, on the NETGEAR web site, and
on

http://readynas.com

.

The initial setup estimated completion time is 20 minutes.

Refer to

Appendix B, “Share Access from MAC and Linux Systems”

for instructions on accessing

shares from Linux and various versions of the MAC OS.

Figure 1-4

Note: A diskless unit requires installing disks and initializing RAID before proceeding.

Go to

http://www.readynas.com/hcl

for a list of supported disks. Refer to

“Using

the Boot Menu to Format a RAID Volume” on page 5-14

for instructions on

installing disks and configuring RAID.

3

4

6

5

1

2

Advertising