Preparing for setup, Installing the system into a rack, Preparing for setup -8 – NETGEAR ReadyNAS 3200 User Manual

Page 16: Installing the system into a rack -8

Advertising
background image

ReadyNAS 3200 Hardware Manual

1-8

Getting Started

v1.1, July 2009

Preparing for Setup

Read these instructions in their entirety before you begin. Locate the ReadyNAS 3200 shipping
carton, remove the rack mounting kit and prepare to work with it.

Installing the System into a Rack

Follow these instructions for installing the system into a rack.

1. The rack mounting kit contains two rail assemblies. Each assembly consists of two sections:

an inner fixed chassis rail that secures directly to the ReadyNAS 3200 chassis and an outer
fixed rack rail that secures directly to the rack itself. Extend the rail assembly by pulling it
outward. Press the release tab and separate the inner rail from the outer assembly.

2. Use the provided mounting screws to mount the inner rails to the system chassis.

Figure 1-6

Advertising